Illustrative connected workflow
One failure.
One continuous quality story.
See how ARQEN carries exact source identity from a drawing requirement and failed inspection into containment, affected product, corrective action, effectiveness, leadership review, and authorized closure.
The connected thread
Each stage produces the governed input required by the next owner. A related-record link alone does not establish containment, cause, effectiveness, or closure.
- 01Owner
Inspection
The requirement enters with a controlled basis.
The inspection plan identifies the drawing revision, characteristic, nominal value, tolerance, method, and accountable inspector.
Governed outputControlled characteristic
- 02Owner
Inspection
A failed result becomes a quality signal.
The measured value fails the deterministic tolerance check. The result retains the work order, part, lot, drawing, plan, and evidence references.
Governed outputFailed result · NCR required
- 03Owner
NCR
Containment starts from the source record.
The NCR is created from the failed inspection context. Affected quantity, potentially affected lots, containment, disposition authority, and due dates become governed work.
Governed outputNCR + affected product
- 04Owner
CAPA
Recurrence pressure triggers corrective action.
Escalation carries the originating NCR and product context into cause analysis, corrective actions, implementation evidence, and responsible ownership.
Governed outputCAPA + action plan
- 05Owner
Verification
Completion waits for an independent result.
Implemented actions do not equal effectiveness. Follow-up evidence and an independent review establish whether recurrence risk was actually reduced.
Governed outputEffectiveness decision
- 06Owner
Leadership
The same thread reaches management review.
Leaders see recurrence, supplier or process pressure, overdue commitments, and the source records behind the signal. Decisions return as owned work.
Governed outputDecision + review action
- 07Owner
Assurance
Closure preserves the product-quality story.
Authorized closure leaves an inspectable chain across requirement, result, containment, cause, action, verification, release decision, and retained evidence.
Governed outputReviewable evidence chain
The operator establishes plan context, selects an authorized drawing, and accepts only verified candidate rows before staging an inspection-plan draft.
Affected product, containment, disposition, responsible people, and evidence remain attached to the exact source event.
Cause, implementation, independent effectiveness review, and closure authority remain distinct and inspectable.
What continuity means
Connected without blurring responsibility.
Source identity
Drawing, revision, work order, part, lot, characteristic, and originating record remain visible.
Owning contracts
Inspection, NCR, CAPA, and Management Review each complete their own governed workflow.
Human authority
Qualified people retain disposition, approval, effectiveness, closure, and release authority.
Evidence lineage
Every downstream decision can be inspected against its source record and supporting evidence.
Bring your own quality thread